Planet XGS3-24042 User Manual Page 36

  • Download
  • Add to my manuals
  • Print
  • Page
    / 721
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 35
2-7
Connection to the Managed Switch requires UTP Category 5 network cabling with RJ-
45
tips. For more information, please see the Cabling Specification in Appendix A.
Step5: Supply power to the Managed Switch.
Connect one end of the power cable to the Managed Switch.
Connect the power plug of the power cable to a standard wall outlet.
When the Managed Switch receives power, the Power LED should remain solid Green.
2.2.2 Rack Mounting
To install the Managed Switch in a 19-inch standard rack, please follows the instructions described below.
Step1: Place the Managed Switch on a hard flat surface, with the front panel positioned towards the front
side.
Step2: Attach the rack-mount bracket to each side of the Managed Switch with supplied screws attached to
the package.
Figure 2-2-2 shows how to attach brackets to one side of the Managed Switch.
Figure 2-2-2 Attach brackets to the Managed Switch.
You must use the screws supplied with the mounting brackets. Damage caused to the
parts by using incorrect screws would invalidate the warranty.
Step3: Secure the brackets tightly.
Step4: Follow the same steps to attach the second bracket to the opposite side.
Step5: After the brackets are attached to the Managed Switch, use suitable screws to securely attach the
brackets to the rack, as shown in Figure 2-2-3.
Page view 35
1 2 ... 31 32 33 34 35 36 37 38 39 40 41 ... 720 721

Comments to this Manuals

No comments